Bad Homburg v. d. Höhe. The groundbreaking ceremony for the new bicycle parking tower at Walter-Lübke-Platz on the south side of the Bad Homburg train station marks another important step in the expansion of the city’s bicycle infrastructure. The fully automated bicycle parking tower will provide secure and convenient parking for 110 bicycles. Commuters who ride their bikes to the train station and continue their journey by bus or train are expected to benefit most from this new facility. It is scheduled to begin operations in the fourth quarter of 2027.
“With the bicycle parking tower, we are creating a modern and secure parking facility at the train station that meets the needs of people who want to get around flexibly and in a climate-friendly way in their daily lives. A secure parking space is especially important for high-quality bicycles and e-bikes, as it makes switching from a bicycle to a bus or train even more attractive,” says Mayor Alexander Hetjes. “In doing so, we are making a concrete investment in sustainable mobility and strengthening the connection between bicycle traffic and public transit.”
The bicycle parking tower will be built on a footprint of approximately 65 square meters and will reach a height of twelve meters. This means the structure will remain well below the maximum permitted building height of 16 meters. The facade will consist of backlit aluminum panels.
Access will be controlled via an app or a stationary terminal. Multiple bicycle access points allow for simultaneous use by different cyclists. Inside, a fully automated system handles the storage and retrieval of bicycles. This is intended to speed up the parking process and make usage particularly convenient. High-quality bicycles, including e-bikes, can also be securely stored this way.
Krauth Technology GmbH, based in Eberbach, Baden-Württemberg, has been commissioned to carry out the project. The company has already built and commissioned similar bicycle parking towers in Waiblingen and Ravensburg.
Construction Work Begins – Commissioning Planned for Late 2027
In the first phase, earthwork and the construction of the foundation slab are expected to be completed by the end of the year. The erection of the steel structure and the installation of the technical systems in the building are then scheduled for the spring, as soon as weather conditions permit. The bicycle parking tower is scheduled to begin operations in the fourth quarter of 2027.
To prepare the construction site, the bicycle racks in the area of Walter-Lübke-Platz will be removed in the coming days. The construction site will then be secured with a construction fence.
Mayor Hetjes emphasizes: “There will be restrictions in the immediate vicinity during the construction phase. We ask all station users and nearby residents for their understanding. However, with the new bicycle parking tower, we are creating a long-term improvement that will benefit many people.”
The federal government is funding approximately 75 percent of the construction costs
The contract value totals approximately 1.6 million euros. Additional costs will be incurred, including those for the foundation and site development of the structure, as well as for the restoration of the adjacent traffic and green spaces once the structural work is complete.
The Federal Office for Logistics and Mobility (BALM) is funding the project as part of the Federal Ministry of Transportation’s “Bicycle Parking Garages at Train Stations” program. The federal government is covering approximately 75 percent of the construction costs. The total eligible expenses specified in the grant award notice amount to approximately two million euros. The city’s share is approximately 500,000 euros.
A Building Block for the Mobility of the Future
The bicycle parking tower is part of the Bad Homburg 2035 Integrated Mobility and Transportation Concept (MOKO) as well as the city’s bicycle transportation plan. Both concepts focus on safe bicycle parking facilities and better integration of bicycles with local public transit. In addition, the project supports the goals of the Integrated Climate Protection Concept (IKK).
The integration of different modes of transportation is also gaining importance in light of the planned expansions to local rail passenger service. These include the extension of the U2 line, the
opening of the Regionaltangente West, and the planned extension of the RB 16 from Friedberg to Bad Homburg Station.
“The train station is a central transportation hub for our city. With the bike parking tower, we’re also preparing for the further development of rail transit and ensuring that bicycles can play an even greater role as a feeder mode of transportation,” said Hetjes. “Our goal is to offer people attractive alternatives to driving—with secure parking options, short distances, and seamless integration of different modes of transportation.”